400KW On-Grid Solar Power System – NUST

About the project

Project Date

09 January, 2024

System Type

On-grid solar power system

Client / Company:

APS Engineering

Project Location:

NUST - Islamabad

400KW On-Grid Solar Power System – NUST

Clean, Efficient, and Sustainable Energy for Education
Project Overview:
Glowsun Engineering (GSE Solar) has successfully installed a 400KW on-grid solar power system at the National University of Sciences & Technology (NUST). This large-scale solar deployment demonstrates the institution’s commitment to sustainability, reducing carbon emissions, and cutting electricity costs through clean and renewable energy. The system integrates Jinko Solar panels with advanced GoodWe inverters, ensuring reliable performance and long-term energy savings.

System Details:

Why It Stands Out:

Sustainable Energy – Significantly reduces reliance on fossil-fuel-based electricity
Proven Technology – Jinko Solar panels deliver high energy yield and durability
Smart Power Management – GoodWe inverters ensure seamless grid integration and monitoring
Cost Savings – Cuts electricity bills while protecting against rising tariffs
Institutional Impact – Supports NUST’s vision for green and energy-smart campuses

Powering Education with Solar Innovation

This 400KW on-grid solar project not only supports the academic and research infrastructure of NUST Islamabad but also sets a benchmark for other universities and institutions across Pakistan. By leveraging clean energy, NUST is shaping a sustainable future — where education and innovation are powered by the sun.